

2025-12-04 Starbase activities:
- Massey’s: Overnight, test tank S39.1 undergoes a short cryo test. (ViX, SGTheHyundaiGuy)
- Two stands are moved from Sanchez to Massey’s. (ViX)
- B18 scrapping continues. (ViX)
- Build site: Another B19 aft section (A6:4) and the bottom section of the transfer tube move from Starfactory to Megabay 1. (ViX)
- Launch site: An axial compressor is delivered to the air separation site. (ViX, Sorensen 1, Sorensen 2, Killip comments)
- The SpaceX LR11000 crane moves from Pad 2 to Pad 1. (ViX)
Florida:
- Gigabay construction continues. (Bergeron)


















No spacesuit, even. Spiff is made of some tough stuff.