• Subtracty@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    ·
    2 months ago

    To be fair, they filled underneath that bridge in and paved over it in 12 days. I95 was the major priority and they could ignore the off ramp for the time being. Building the bridge took much longer even with great deal of manpower and equipment dedicated to it.