The train is expected to use a newly built, separate electrified track and run frequently. In addition to Quebec City, Montreal and Toronto, it would serve Trois-Rivières, Laval, Ottawa and Peterborough.
Transport Canada initially estimated that the cost of a high-speed rail link between the two cities could be as high as $80 billion.
It’s expected to take four to five years to design the future high-speed line. Funds are to be allocated at the end of that time period, so it’s possible a future government could modify or cancel the project.
Doug ford wants to spend 60billion on a tunnel under the 401 that would serve far far fewer people, drives me crazy that’s even on the table.
Local projects make corruption easier
Does he want fElon to dig it?