Microsoft Looking to Use Nuclear Reactors to Power Its Data Centers::undefined

  • Diplomjodler@feddit.de
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    3
    ·
    9 months ago

    It would still be far cheaper to deploy the same kind of capacity in renewables. Whoever came up with this brilliant plan can’t do basic math.

    • Earthwormjim91@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      9 months ago

      Probably not because they would need to buy MUCH more land to do it.

      SMRs are so much more compact per MW. The one from NuScale that is approved already can do 924MW in 0.05 square miles. To do the same capacity with wind would take 94 square miles and 17 square miles for solar.

      Buying 17 square miles of land close enough to just one of their data centers would cost billions, on top of the cost of paying for the panels and installation.

      The whole point of them looking at these at all is because they do not want to purchase from the grid.