I’ve been trying to figure out the peak power demands and an uninterruptible power supply that can handle it. There doesn’t seem to be any documentation for this. It just needs to run long enough to power off safely. It’s a Trotec speedy 360. Any help would be greatly appreciated!
Edit 360 not 400 and it’s an 80W laser
Solved!
120w laser will draw 3100W per hour, not 120W.the 120W refers only to the effective output power of the actual optic laser itself, not the power consumption of the lazing equipment, electronics controller(s), inverters, stepper drivers, etc. (see image 1)
The only question left is what duration of backup power you want? There’s a big difference in between 5 minutes of laser power and 3 hours of laser power.
If you want 2 hours of backup power, you need a 6200 Watt-Hour UPS with 208/230Vac output, single phase, capable of delivering ~16 amps.
We use the following website at work. Among other things, we develop backup power solutions for critical infrastructure life safety systems;
Www.sizemyups.com
The Eaton website linked elsewhere in another comment is also a great website/company.
Image snip above was sourced from your user manual, I’ve uploaded a copy here:
https://pdfhost.io/v/.YdPy6VXQ_Titel
I found that section in my manual for the Speedy 360 it shows power consumption at 1400W for the 80W laser version. There quite a few options for ups using those two search links provided above.
Thank you for your help!